Categories: Local News / City Infrastructure

White Oak Road Closure in London: What to Expect and How to Plan

White Oak Road Closure in London: What to Expect and How to Plan

Overview of the White Oak Road Closure

Starting Monday, October 6, weather permitting, a significant road project will close White Oak Road between the Highway 402 bridge and Westminster Drive. This closure, essential for replacing aging infrastructure, is part of a broader effort to improve roadway safety, drainage, and utility services in the area. While the road will be closed to through traffic, access to nearby homes and businesses will be maintained, ensuring minimal disruption for residents and commercial customers.

What’s Happening and Why

Crews will remove the existing road surface, repair the base, and repave with fresh asphalt, including improvements to the shoulders. The project also includes upgrades to the City of London Bulk Water Station, the installation of new culverts, and enhanced drainage along the corridor. These upgrades are designed to reduce flood risk, improve water service reliability, and extend the lifespan of the roadway. The construction is expected to be completed by late Fall, with some final cleanup and touch-up work continuing into 2026.

Detour Routes and Traffic Management

During the closure, motorists will follow a signed detour using two routes:
– Dingman Drive, between Wonderland Road South and Wellington Road South
– Scotland Drive, between Wonderland Road South and White Oak Road

These detours are designed to maintain access to local properties while redirecting through traffic away from the work zone. Drivers should plan additional travel time and be prepared for temporary congestion, especially during peak hours.

Impacts on Local Access and Businesses

Access to homes, businesses, and properties along White Oak Road will be preserved. While the detour routes are in place, customers may experience slightly longer travel times and parking adjustments in the area. Local businesses are encouraged to post updates for customers and consider flexible scheduling to reduce the impact of the closure.

How to Stay Informed

To help residents and commuters stay informed, London is providing ongoing construction updates. You can monitor progress and plan ahead by visiting london.ca/construction or using the interactive map at london.ca/roadwork. Signing up for alerts or checking the map before heading out can save time and reduce frustration.

Timeline and What Comes Next

The main construction is anticipated to wrap up in late Fall, with the final cleanup and touch-up work extending into 2026. While weather conditions can affect schedules, the project team aims to complete the core upgrades in a timely manner. Ongoing maintenance will ensure the improvements deliver lasting benefits to the community.

Tips for Drivers and Commuters

  • Plan ahead and review the detour routes before traveling.
  • Use navigation apps like Waze or Google Maps for real-time updates.
  • Allow extra travel time during peak periods.
  • Respect posted signs and follow directions from road crews for safety.

Why This Detour is Necessary for Long-Term Benefits

Replacing the road surface and stabilizing the base improves ride quality and reduces maintenance needs over time. Upgraded drainage minimizes water-related damage, while the upgraded water station supports reliable service for nearby communities. Although the closure may be inconvenient in the short term, the improvements promise safer, smoother travel and better infrastructure for years to come.